Building Division Administrative and User Fees

Print
(A) Expired Permit Fees
1 Renewal-expired permits - All disciplines:

a. Within 30 days of expiration………………original fee at 10%

b. Each additional 30 days or portion thereof, add additional 10%, not to exceed 100% of original fee ,minimum fee shall not be less than:  55.00
(B) Miscellaneous Fees
1 All construction include educational & training fees (per thousand of estimated cost) 0.21
2 Electronic water meters, per building 55.00
3 Retrofit burglar alarms, per building 55.00
4 Certificate of occupancy:

a. Standard

b. Temporary, per residential units, per unit per 30 days 60.00

c. Temporary, partial or stocking for commercial and other non-residential buildings: 

c.1. Day 1 thru Day 30 120.00

c.2. Day 31 thru Day 60 245.00

c.3. Day 61 thru Day 90 305.00

c.4. For each. 30 day period thereafter 610.00
5 Permit card replacement- all disciplines 18.00
6 Permit extensions prior to expiration - original fee at: 10%

minimum fee shall not be less than: 55.00

and the maximum fee shall not exceed: 305.00
7 Contractor records, maintenance, annually 30.50
8 Temporary construction-related structure 60.00
9 Public art fees

a.1. New building construction/redevelopment: Public Art fund contribution, per Sq.Ft. of gross floor area 0.49

a.2. On site artwork, per Sq.Ft. of gross floor area 0.62

b.1. Remodeling/converting: Public Art contribution, per Sq.Ft. of gross floor area being remodeled 0.25

b.2  On site artwork, per Sq.Ft. of gross floor area being remodeled 0.31
10 Temporary use permit 60.00
(C ) Building Permit Fees
1 New Construction - residential

a. New Construction - Residential: Structural - % of total construction value 0.87%

b. New Construction - Residential: Electrical - % of total construction value 0.31%

c. New Construction - Residential: Plumbing - % of total construction value 0.15%

d. New Construction - Residential: Mechanical - % of total construction value 0.14%
2 New Construction - commercial

a. New Construction - Commercial: Structural - % of total construction value 0.62%

b. New Construction - Commercial: Electrical - % of total construction value 0.35%

c. New Construction - Commercial: Plumbing - % of total construction value 0.09%

d. New Construction - Commercial: Mechanical - % of total construction value 0.06%
3 Residential additions

a. Residential Additions: Structural 2.80%

b. Residential Additions: Electrical 0.80%

c. Residential Additions: Plumbing 1.20%

d. Residential Additions: Mechanical 0.60%
4  Residential Alterations: 

a. Structural: % of total construction value unless otherwise provided below, in subsections (1), (2) 2.90%

(1) The value of counter tops shall be deducted from the total construction value.

(2) The value of cabinet replacement only will be a min. of $167.86 or 2% of total construction value, whichever is greater shall be charged herein 169.00

b. Electrical: % of total construction value 0.90%

c.  Plumbing: % of total construction value 1.10%

d. Mechanical:  % of total construction value  1.10%
5 Commercial alterations/additional/tenant improvements:

a. Structural:  % of total construction value  1.90%

b. Electrical:  up to $119,597  -  % of total construction value 1.80%

                      over $119,597  -  per inspection 55.00

                     per hour plan review fee 103.00

c. Plumbing: Up to  $119,597   -  % of total construction value 1.30%

                   Over  $119,597  - per inspection 55.00

                     per hour plan review fee 103.00

d. Mechanical: Up to   $119,597  -  % of total construction value 0.80%

                   Over  $119,597  - per inspection 55.00

                     per hour plan review fee 103.00
6 Reinspection - all disciplines

a.   - First 48.50

b.   - Second 60.00

c.  -  Third 120.00

d.  - Fourth 220.00

Upon fifth and subsequent disapprovals, and without a certified supervisor or representative at the job site at time of inspection, the applicable fee shall be doubled.

"Certified," for the purposes of this ordinance, shall include the following:
a. The qualifier (person authorized by state and county authorities to apply for and receive a building permit); or
b. A representative for the contractor that has a recognized master (or Class "A" certified) or journeyman status in the appropriate trade; or
c. A representative for the contractor that has a State of Florida license in architecture or engineering and has sufficient education and knowledge in the appropriate field.
7 Lost plan review  (replacement of on-site plans: sfr, multi, commercial, covers all disciplines)  74.00
8 Plan resubmittal fee  (for 3rd and subsequent resubmittals)  48.50
9 Open permit request - per request 30.75
10 Change in contractor and/or subcontractor - all disciplines  37.00
11 Contractor overtime request-plan review per hr, minimum 85.00
12 Contractor overtime request-inspections per hr, minimum  85.00
13 Expedited plan review, per hour ( one hour minimum)  85.00
(D) Structural Permit Fees
1 Administrative fees 55.00
2 Awning (each): Base fee 77.00

                         plus per awning 25.25
3 Deck (wood) 159.00
4 Demolition/blasting 91.00
5 Fence - base fee 55.00

             plus, per lineal foot 0.25
6 Landscape affidavit 37.00
7 Garage door 60.00
8 Gutters 60.00
9 House moving filing fee within the City of Coral Springs 245.00
10 Hurricane Shutters ( SFR duplex, triplex - each multifamily, commercial, per floor):

a.  1-3 shutters 60.00

b.  Each additional shutter 5.25
11 Major plan revision (work not to exceed 1 hour) 103.00
12 Masonry wall - base fee 60.00

                         plus, per lineal foot 0.43
13 Minimum fee (one inspection) 55.00
14 Minor plan revision (corrections, lost plans, work not to exceed 15 minutes) 38.00
15 Pool/spa/hot tub 141.00
16 Roofs/re-roofs:

a. Flat re-roof: 119.00

b. Flat re-roof ( commercial):

  1. First 50 squares 119.00

  2. Each additional 50 squares 55.00

c. Re-roof slope 149.00

d. Roof repair (2 squares and under) 55.00

e. Roof slope and flat 270.00
17 Satellite dish ( over 18" requires separate electric permit) 79.00
18 Screen enclosure - pool 103.00
19 Screen enclosure - porch/patio 103.00
20 Signs ( unlighted, permanent or temporary) 79.00
21 Slab ( porch, patio, monolithic)  85.00
22 Tent ( any size, each) 55.00
23 Trailer (construction, storage, each) 146.00
24 Window/door replacement 55.00

                plus  $5.25  per unit 5.25
25 Demolition   91.00
26 Per hour plan review fee ( minimum of one hour) 82.00
 (E ) Electrical Permit Fees
1 A/C change out 90.00
2 Meter can 55.00
3 Burglar alarm

a.  1. New construction: pre-wire ( per floor)  55.00

     2. New construction ( SFR, duplex, triplex, each multifamily commercial per floor)  55.00

b.  1. Retrofit (Duplex, triplex, each multifamily): per floor up to 6 units 55.00

      with each additional unit at a cost of  $5.25  each 5.25
4  Commercial site lighting:

a.  1-3 light standards 55.00

b.  Each additional light standard 12.60
5 Computer systems (commercial, per floor) 113.00

Computer systems pre-wire (per floor) 55.00
6 Electric sign (each) 90.00
7 Electronic water meters, per unit 7.40
8 Energy management system 55.00
9 Fire alarm ( SFR, duplex, triplex - each multifamily, commercial, per floor) 137.00
10 Heat pump 105.00
11 Low voltage- individual systems (minimum fees):

a.  Computer lines 55.00

b.  Intercom 55.00

c.  Phone 55.00

d.  Speakers 55.00

e.  T.V.  55.00

f.  Vacuum 55.00

g.  1. Sprinkler time clock, new installations only : 1-3 time clocks 55.00

     2. each additional time clock 7.35
12 Major plan revision (work not to exceed 1 hour) 103.00
13 Minimum fee (one inspection) 55.00
14 Minor plan revision ( corrections, lost plan, work not to exceed 15 min) 38.00
15 Phone Booth ( minimum fee)  55.00
16 Pool/spa/hot tub/fountain 164.00
17 Pool alarm system 55.00
18 Radon mitigation (per unit) 55.00
19 Satellite dish ( requires separate structural permit)  96.00
20 a. Service Change:  Residential 89.00

b. Service Change:  Commercial 113.00
21 Sprinkler Pump, heat pump 103.00
22 Temporary electric 74.00

  30-day temporary electric 47.50
23 Trailer (construction, sales, etc…) 93.00
24 Demolition 91.00
25 Per hour plan review fee ( a minimum of one hour) 82.00
(F) Plumbing Permit Fees
1 Backflow preventer (new installation only), min. fee 79.00
2 Electronic water meters, per unit 6.10
3 Fire sprinkler system 187.00
4 Gas pool heater 61.00
5 LP Gas system ( 1 tank, 1 meter, 2 outlets)  61.00
6 LP Gas tank(s) 61.00
7 Major plan revision (work not to exceed 1 hour) 103.00
8 Minimum fee (one inspection) 55.00
9 Minor plan revision ( corrections, lost plans, work not to exceed 15 minutes) 38.00
10 Sewer hook-up 61.00
11 Site work, drainage, water mains, fire, sewer mains - % of contract price  2%
12 Solar pool heater/water heater 79.00
13 Water heater (domestic water) 61.00
14 Water well 2" - 4 1/2 " 61.00
15 Demolition 91.00
16 Per hour plan review fee ( minimum of one hour) 82.00
(G) Mechanical Permit Fees
1 A/C change out 91.00
2 Gas, pool heater 61.00
3 LP Gas system (1 tank, 1 meter, 2 outlets) 61.00
4 LP Gas tank(s) 61.00
5 Major plan revision (work not to exceed 1 hour) 103.00
6 Minimum permit (one inspection) 55.00
7 Minor plan revision ( corrections, lost plans, work not to exceed 15 minutes) 38.00
8 Radon mitigation  61.00
9 Demolition 91.00
10 Per hour plan review fee ( a minimum of one hour) 82.00

In addition to the fees above, the applicant should review the requirements of Chapter 5 of the Code of Ordinances and any other applicable codes.